The $40 million reconstruction of I-37 and Southeast Military Drive will reshape how drivers travel through one of southeast San Antonio’s major highway connections near Brooks Air Force Base. Following the September 24 groundbreaking, the nearly two-mile project is expected to continue through late 2029, bringing a diverging diamond interchange, an elevated bypass ramp, new roadway connections, and shared-use paths to the area.

Building these improvements means introducing new traffic patterns and highway connections while the existing interchange remains in use. Crews must coordinate construction around active lanes, surrounding access points, and the work required to bring each new section into service. The order in which those pieces come together will influence when traffic can shift and which areas become available for the next stage of construction.

 

Understanding the New Interchange Design

At the center of the project is a diverging diamond interchange, which briefly directs traffic on Southeast Military Drive to the left side of the roadway through two signal-controlled crossovers before returning vehicles to the right. This design allows drivers turning left onto I-37 entrance ramps to make that movement without crossing opposing traffic, changing how vehicles move between the highway and surrounding roads.

The new configuration will also require drivers to follow a different arrangement of lanes, signals, and turning movements. Because the crossovers operate as part of a connected system, the placement of traffic signals, pavement markings, and ramp entrances will play an important role in guiding vehicles through the interchange.

Beyond the crossovers, the project includes an elevated bypass ramp, a southbound frontage road, and an auxiliary lane extending toward the I-410 exit. These additions will change how vehicles move between the interchange and nearby highway connections, making the reconstruction a broader redesign of traffic flow through the corridor.

 

Why Construction Happens in Stages

The I-37 reconstruction involves more than replacing the roadway at Southeast Military Drive. Crews must account for the new diverging diamond traffic pattern, an elevated bypass ramp, and additional connections toward I-410, all within a corridor that drivers and nearby businesses continue to use. The challenge is determining when each new section can be built and brought into service without disrupting access to other parts of the interchange.

The diverging diamond design adds a particular challenge because its two signal-controlled crossovers must eventually operate together, with entrance and exit ramps connecting to the new traffic pattern. Meanwhile, construction of the elevated bypass and southbound auxiliary lane must be coordinated with the existing highway connections. Each feature introduces different requirements for when work can proceed and when a completed section can begin carrying traffic.

Although TxDOT has not published a detailed phase-by-phase construction schedule, several features of the proposed design illustrate the decisions crews will need to account for.

Project feature Construction considerations specific to I-37
Diverging diamond crossovers The two crossover intersections must guide Southeast Military Drive traffic through the new left-side configuration, with signals, markings, and ramp access coordinated before the pattern is introduced.
Elevated bypass ramp Construction of the elevated structure must account for work areas and equipment access near existing traffic, followed by connections to the adjoining roadway.
Southbound frontage road and auxiliary lane The new frontage road must transition into the auxiliary lane toward I-410, requiring coordination where the new pavement joins the existing highway network.
Access around Brooks Changes to Southeast Military Drive, entrance ramps, and frontage-road connections may affect different routes into nearby businesses and neighborhoods, requiring access planning for each affected movement.

A completed section of pavement or an elevated structure may remain closed until its adjoining connections are ready. At I-37, that could mean waiting for the new crossover configuration, ramp approaches, or connections toward I-410 before shifting traffic onto a finished section. These dependencies help explain why construction progress and changes to the routes drivers use may not happen at the same time.

 

What Goes Into a Traffic Shift

A traffic shift at I-37 can affect more than the number of lanes available. Depending on the construction area, drivers may need to follow a different approach to an entrance ramp, use a temporary alignment along Southeast Military Drive, or adjust to new turning movements as portions of the interchange are completed. Each change requires traffic controls that make the intended route clear before vehicles begin using it.

The diverging diamond adds another consideration because its finished configuration will direct Southeast Military Drive traffic through two signal-controlled crossovers. Introducing that pattern requires the signals, lane markings, and ramp connections to operate as a coordinated system. During construction, temporary routes must also be distinguishable from the permanent configuration so drivers can follow the correct movements.

For businesses and residents around Brooks, the location of a closure can be more useful than the number of lanes affected. A restricted entrance ramp may change how employees reach I-37, while work on Southeast Military Drive could affect customers or deliveries approaching from a particular direction. Checking the specific ramp, intersection, or travel direction affected can help people plan around those changes without assuming the entire interchange is inaccessible.

Most lane closures are expected to take place overnight on weekdays, generally between 9 p.m. and 5 a.m., according to TxDOT. As construction progresses, advance notices will help drivers identify which approaches are affected and when alternate routes may be needed.

 

Keeping Roadway Projects Moving From Start to Finish

The I-37 reconstruction near Brooks is a reminder of how much planning goes into improving infrastructure that thousands of people continue to rely on throughout construction. Every traffic shift, roadway connection, and completed section of pavement contributes to a larger effort to improve how people travel through southeast San Antonio. Getting there requires coordination between crews, careful attention to changing site conditions, and a clear understanding of how each stage affects the next.

At E-Z Bel Construction, that coordination is familiar to our teams working across roadway reconstruction, traffic signals, underground utilities, and bridge construction. We understand the importance of planning for the work ahead while accounting for the people and communities who depend on these routes every day. If you’re preparing an infrastructure project in South or Central Texas, our team is ready to discuss how we can support its construction.